WMS ( Work Management System )

WMS Training is the replacement of current PTW system in ADNOC. This system is a single system framework which will be replacing different E-PTW system existing across ADNOC group

HSE Training - ADNOC Courses

WMS ( Work Management System )

WMS (Work Management System) Training replaces the existing Permit to Work (PTW) system within ADNOC. This new framework consolidates various E-PTW systems used across ADNOC group companies into a single, unified procedure. The WMS integrates five critical HSE activities: Job Safety Analysis (JSA), PTW, Energy Isolation, Temporary Defeat, and SIMOPS (Simultaneous Operations).

This system applies to all ADNOC group companies and stakeholders, including contractors. All contractors working with ADNOC must complete WMS Training and demonstrate competency to ensure they adhere to the new procedure.


WMS ( Work Management System )

Course Outline - Modules

  • Key Objectives of Introducing WMS
  • Purpose of Framework
  • Scope and Exceptions
  • Roles and Responsibilities (Proper Harmonization)
  • Framework including WMS Elements
  • Periodic Review and Types of Audit
  • Questions and Answers (Discussion)
  • Introduction
  • Purpose of JSA
  • Scope and Exceptions
  • Key Roles and Responsibilities
  • Framework of JSA and Types
  • Document Library Requirements
  • JSA Level 1 & 2 and FRA and Contents
  • Approval of Controls
  • Questions and Answers (Discussion)
  • Introduction
  • Purpose
  • Scope and Exceptions
  • Key Roles and Responsibilities
  • When Temporary Defeat is Applicable
  • Conditions Required for Temporary Defeat
  • Types of Defeat based on category and duration
  • Defeats on Isolated/Out of Service Equipment
  • Non-Permitted or Prohibited Defeats
  • Duration of Defeat and DGS
  • Process of Defeat
  • Hazard Identification and Mitigation Controls
  • Alternate Protection of HSECES using Hierarchy of Control
  • Responsibility of Monitoring Personnel 
  • How to select approval authority for defeat 
  • Extended Period Defeat (EPD) Approval and Validity  
  • Restoring HSECES Back to service 
  • Questions and Answers (Discussion
  • Introduction to PTW
  • Content of PTW & Purpose
  • Scope and Exceptions
  • Roles and Responsibilities (Proper Harmonization)Exceptions from PTW Procedure
    PTW interface Procedure (ADNOC GC and External Authorities)
  • Types of Permit and their sections
  • Types of Certificate and their sections
  • Document Requirements and Backup Requirements for PTW
  • Validity of Permit and Certificate & Signatory Limits
  • Structure of PTW= 8 Step Approach in Detail
  • RFO Suspension Rules
  • Questions and Answers (Discussion
  • Introduction
  • Purpose
  • Scope and Exceptions
  • Roles and Responsibilities (Proper Harmonization)
  • Framework of Energy Isolation (IC) Certificate
  • Types of IC certificate and content
  • Steps of Energy Isolation- (9 Step Process)
  • Roles of Area Authority, Isolating Authority (ISA) and Isolating Operator (ISO) in IC
  • Baseline Isolation and Types, Minimum Isolation Standard and Exceptions
  • Isolation Implementation Requirements
  • Authorizing PTW and RFO Exceptions
  • Importance of LOTO
  • Independent Verification
  • Zero Energy Verification Requirements
  • Sanction to Test (STT) Process
  • Deisolation Process
  • Extended Period Isolations (EPI)
  • Questions and Answers (Discussion)
  • Introduction
  • Purpose
  • Scope and Exceptions
  • SIMOP Coordinator (SC) Roles and Responsibilities
  •  Types of SIMOPS
  • SIMOP Matrix/MOPO Matrix
  • Restriction Table and Usage
  • 4 Stages of SIMOP In detail
  • Importance of SIMOP Management Plan
  • Questions and Answers (Discussion)